Commissioning organization logo Image: basalt.net ↗ Open call at review
Town of Basalt — Public Arts Commission · Basalt, CO
Permanent landmark at East Valley Road and Willits Lane in west Basalt.
Published funding USD Up to 100,000
Funding scope Maximum for design, fabrication, delivery, installation and accessories, including lighting.
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor sculpture permanent civic
Commissioning organization logo Image: visitmontrose.com ↗ Copyright 2026 City of Montrose. All Rights Reserved. (as credited at source) Deadline passed; outcome unconfirmed
City of Montrose · Montrose, CO
Representational steel artwork at the Rio Grande Avenue/Oak Grove Road roundabout and adjoining corridor; published deadline has passed.
Published funding USD 75,000
Funding scope All-in design, engineering, fabrication, transport, foundations, installation, permits and insurance.
Deadline as published September 27, 2026 Deadline date has passed. This does not establish the selection outcome.
outdoor sculpture permanent metal civic
Source-page image · match unverified Image: discover.pbc.gov ↗ Deadline passed; outcome unconfirmed
Palm Beach County — Art in Public Places · Delray Beach, FL
Architectural tile artwork for the aquatic complex’s entrance and ticketing building.
Published funding USD Up to 348,000
Funding scope Maximum all-in commission; includes design, engineering, permitting, fabrication, delivery, installation and insurance. Artist fee may not exceed 10% of the total project budget.
Deadline as published October 19, 2026, by 11:59pm EDT Deadline date has passed. This does not establish the selection outcome.
outdoor civic
Representative commissioner image Image: dcarts.dc.gov ↗ Open call at review
DC Commission on the Arts and Humanities · Washington, DC
Four artists or teams will create ground murals near four public schools through student-led design engagement.
Published funding USD 30,000
Funding scope Grant per selected artist/team; four awards. Covers project delivery, with artist fee capped at 20%.
Deadline as published Monday, November 16, 2026 at 5 pm EST Future calendar date; confirm current terms with the commissioner.
outdoor community civic
Source-page image · match unverified Image: 4culture.org ↗ © 4Culture (as credited at source) Deadline passed; outcome unconfirmed
4Culture · Seattle, WA
Design-only commission for east stairwell glass and an upper north window at the upgraded wastewater station.
Published funding USD 40,000
Funding scope Artist design fee; implementation separately managed by 4Culture. Up to $5,000 additional design-phase travel.
Deadline as published Thursday, October 22, 2026, 4:00 PM (PDT) Deadline date has passed. This does not establish the selection outcome.
civic waterfront
Commissioning organization logo Image: mainearts.maine.gov ↗ ©Maine Arts Commission. All Rights Reserved. (as credited at source) Closed at review
Maine Arts Commission — Percent for Art · Sanford, ME
Permanent campus landmark for the Center of Excellence for Manufacturing and Trades; the agency explicitly marks the RFQ closed.
Published funding USD 35,998
Funding scope All-in commission including artist fees, materials, fabrication, installation, travel, documentation and insurance.
Deadline as published 11:59 pm on September 28, 2026 Deadline date has passed. This does not establish the selection outcome.
outdoor permanent civic
Source-page image · match unverified Image: jhpublicart.org ↗ © Jackson Hole Public Art, Jackson, WY (as credited at source) Awarded
Jackson Hole Public Art · Jackson, WY
September 2026 announcement confirms John Grade’s selection for a permanent sculpture inspired by local trees and forest connections.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
indoor outdoor sculpture permanent civic
Representative commissioner image Image: stayarlington.com ↗ ©️2026 Arlington Convention and Visitors Service - All Rights Reserved (as credited at source) Awarded
Arlington County — Public Art · Arlington, VA
Kipp Kobayashi’s selected suspended civic-map sculpture incorporates community routes; installation completion is not expressly confirmed.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
indoor sculpture metal community civic
Verified project-site image Image: content.govdelivery.com ↗ Deadline passed; outcome unconfirmed
City of Minneapolis — Arts and Cultural Affairs · Minneapolis, MN
Community research will inform artwork inside the tunnel and on its facade, connecting park spaces and nearby residents.
Published funding USD 250,000
Funding scope Total project budget, including $30,000 engagement/design; fabrication contract follows Arts Commission design approval.
Deadline as published October 26, 5 p.m. Central Time Deadline date has passed. This does not establish the selection outcome.
outdoor community park civic
Source-page image · match unverified Image: designinglocal.com ↗ Deadline passed; outcome unconfirmed
City of Hilliard · Hilliard, OH
Create an exterior sculpture for the new recreation and wellness facility, reflecting Hilliard’s character.
Published funding Not documented
Funding scope Not documented
Deadline as published October 26, 2026, by 3pm EST Deadline date has passed. This does not establish the selection outcome.
outdoor sculpture civic
Commissioning organization logo Image: lexarts.org ↗ © Copyright 2026 LexArts | All rights reserved (as credited at source) Deadline passed; outcome unconfirmed
LexArts · Lexington, KY
Commission a major exterior artwork for the west facade, with visual impact from surrounding pedestrian and vehicle routes.
Published funding USD 1,000,000
Funding scope Approximately $1 million anticipated all-in implementation budget, including design, engineering, fabrication, transport, permits, installation, insurance, travel and documentation.
Deadline as published September 30, 2026 Deadline date has passed. This does not establish the selection outcome.
outdoor civic
Commissioning organization logo Image: cityoforinda.gov ↗ Closed at review
City of Orinda · Orinda, CA
Coordinate murals at the Camino Pablo underpass and pedestrian bridge above the Highway 24 off-ramp into north Orinda.
Published funding Not documented
Funding scope Not documented
Deadline as published 11:59 p.m. Pacific Time on September 27, 2026 Deadline date has passed. This does not establish the selection outcome.
outdoor transit civic
Representative commissioner image Image: wyoarts.state.wy.us ↗ © 2026 - Wyoming Arts Council, All Rights Reserved. (as credited at source) Announced
Wyoming Arts Council · Sheridan, WY
The Arts Council identifies a new project bringing original artwork into Sheridan College’s science facility.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
indoor civic
Source-page image · match unverified Image: lasvegasnevada.gov ↗ Copyright 2026 by city of Las Vegas (as credited at source) Open call at review
City of Las Vegas — Public Art and Gallery Program · Las Vegas, NV
Curated display reflecting Las Vegas culture and identity, planned for May 2027–May 2028 at City Hall.
Published funding USD 0
Funding scope No artist stipend; this is an exhibition display opportunity. City takes no sales commission.
Deadline as published February 3, 2027, at 5 p.m. (PST) Future calendar date; confirm current terms with the commissioner.
indoor temporary civic
Representative commissioner image Image: portal.ct.gov ↗ © 2026 CT.gov - Connecticut's Official State Website (as credited at source) Open call at review
Connecticut Office of the Arts — Art in Public Spaces · Bridgeport, CT
Acquisitions for Beacon Hall support Housatonic Museum of Art’s 2027 anniversary, campus learning and surrounding communities.
Published funding USD 275,000
Funding scope Total purchasing pool across multiple works, not an individual award.
Deadline as published December 15, 2026 at 11:59 PM (ET) Future calendar date; confirm current terms with the commissioner.
indoor civic
Representative commissioner image Image: portal.ct.gov ↗ © 2026 CT.gov - Connecticut's Official State Website (as credited at source) Open call at review
Connecticut Office of the Arts — Art in Public Spaces · Hartford, CT
Existing artwork will furnish the state office building’s public interiors, with some works rotating among rooms. Connecticut identity informs selection.
Published funding USD 525,000
Funding scope Total acquisition pool for multiple purchases, not a single artist fee.
Deadline as published January 15, 2027 at 11:59 PM (ET) Future calendar date; confirm current terms with the commissioner.
indoor civic
Representative commissioner image Image: content.govdelivery.com ↗ Open call at review
Louisville Downtown Partnership · Louisville, KY
Functional installation at 220 South Fourth Street is planned for August 2027. Temporary siting may last several years.
Published funding USD 70,000–75,000
Funding scope All-in design, artist, travel, insurance, materials, fabrication and installation budget.
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor temporary civic
Commissioning organization logo Image: artsandmuseums.utah.gov ↗ Deadline passed; outcome unconfirmed
Utah Division of Arts & Museums — Public Art Program · UT
Historic building renovation housing Mathematics and Statistics seeks mathematics-related artwork. Artwork completion is scheduled for summer 2028.
Published funding USD 164,000
Funding scope All-in commission: artist fee, fabrication, supports, insurance, transport, lighting, installation and documentation.
Deadline as published October 12, 2026, 11:59pm MDT Deadline date has passed. This does not establish the selection outcome.
indoor civic
Representative commissioner image Image: ww2.scottsdaleaz.gov ↗ City of Scottsdale (as credited at source) Deadline passed; outcome unconfirmed
Scottsdale Arts — Scottsdale Public Art · Scottsdale, AZ
Permanent exterior work at 9045 East Via Linda will be coordinated with the station design team and community stakeholders. Deadline has passed; award not confirmed.
Published funding USD 80,000
Funding scope Total project realization budget.
Deadline as published September 14, 2026, 11:59 p.m. MST (AZ) Deadline date has passed. This does not establish the selection outcome.
outdoor permanent sculpture civic
Source-page image · match unverified Image: augustaarts.com ↗ © Copyright Greater Augusta Arts Council (as credited at source) Deadline passed; outcome unconfirmed
Greater Augusta Arts Council · Augusta, GA
Ten existing outdoor sculptures are sought for downtown display January 2027–December 2028. Application deadline passed; selections unconfirmed.
Published funding USD 3,000
Funding scope Two-year lease per work; $1,500 at installation and $1,500 at removal.
Deadline as published October 1, 2026 Deadline date has passed. This does not establish the selection outcome.
outdoor temporary sculpture civic
Commissioning organization logo Image: publicartist.org ↗ Closed at review
City of Austin — Art in Public Places · Austin, TX
Lobby staircase sculpture at 8301 Johnny Morris Road is scheduled for September 30, 2027 installation. Application is explicitly closed.
Published funding USD 300,000
Funding scope All-in milestone-paid commission including engineering, fabrication, insurance, transport, permits and installation.
Deadline as published 08/03/2026 Deadline date has passed. This does not establish the selection outcome.
indoor permanent sculpture civic
Source-page image · match unverified Image: vermontartscouncil.org ↗ © Copyright 2008–2026. State of Vermont. All rights reserved. (as credited at source) Completed
Vermont Arts Council — Art in State Buildings · White River Junction, VT
Noa Younse of Pixel Patch Creative completed the courthouse installation in March 2026. This is a completed commission benchmark.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
indoor civic
Source-page image · match unverified Image: boiseartsandhistory.org ↗ Copyright 2026 City of Boise. All rights reserved. (as credited at source) Deadline passed; outcome unconfirmed
City of Boise — Department of Arts & History · Boise, ID
Up to eight artists create original works for traffic-box vinyl wraps, responding to Surprise! Installation is planned for summer 2027.
Published funding USD 1,200
Funding scope Per selected artist/team for original artwork; fabrication and installation excluded from artist responsibilities.
Deadline as published October 15, 2026, at 1:00 p.m. (MT) Deadline date has passed. This does not establish the selection outcome.
outdoor civic
Commissioning organization logo Image: content.govdelivery.com ↗ Open call at review
City of Raleigh — Raleigh Arts · Raleigh, NC
Three tunnel-entrance commissions, with installation planned by the end of 2027.
Published funding USD 30,000
Funding scope Per project, including design, fabrication, taxes, travel and fees; separate City engagement/access funds.
Deadline as published November 20, 2026, at 11:59 PM Future calendar date; confirm current terms with the commissioner.
outdoor civic
Representative commissioner image Image: content.govdelivery.com ↗ Open call at review
City of Raleigh — Raleigh Arts · Raleigh, NC
Two artists/teams each paint up to five sewer risers; installation planned for summer 2027.
Published funding USD 5,000
Funding scope Per artist/team, including design, installation, taxes, travel and fees; separate City engagement/access funds.
Deadline as published November 20, 2026, at 11:59 PM Future calendar date; confirm current terms with the commissioner.
outdoor community civic
Source-page image · match unverified Image: artsneworleans.org ↗ Deadline passed; outcome unconfirmed
Arts New Orleans · New Orleans, LA
Water-themed permanent sculpture at Canal Street and S. Norman C. Francis Parkway, on the former Jefferson Davis monument site.
Published funding USD Amount not documented
Funding scope Unresolved: RFQ cover lists $150,000; budget section says $170,000 inclusive commission. Arts New Orleans separately covers permits and long-term maintenance.
Deadline as published September 9, 2026 @ 11:59 pm CST Deadline date has passed. This does not establish the selection outcome.
outdoor sculpture permanent community civic
Representative commissioner image Image: pgparks.com ↗ Deadline passed; outcome unconfirmed
M-NCPPC — Prince George’s County Parks and Recreation · Lanham, MD
Entry-plaza sculpture coordinated with the community center's planned June 2027 completion.
Published funding USD Up to 200,000
Funding scope Maximum all-inclusive allocation, including engineering, footings, transport and installation.
Deadline as published 12 MIDNIGHT (EASTERN STANDARD TIME) FRIDAY, SEPTEMBER 25, 2026. Deadline date has passed. This does not establish the selection outcome.
outdoor sculpture permanent civic
Commissioning organization logo Image: amplifyarts.submittable.com ↗ Deadline passed; outcome unconfirmed
Amplify Arts · Omaha, NE
Thirteen North Omaha Trail artworks plus a complementary Chambers Court opportunity; installation planned by October 2027.
Published funding USD Amount not documented
Funding scope Amounts depend on site/media and are disclosed after selection; concept development paid.
Deadline as published Sunday, October 4, 2026, 11:59 pm CST Deadline date has passed. This does not establish the selection outcome.
outdoor community sculpture civic
Representative commissioner image Image: dallascityhall.com ↗ Announced
City of Dallas — Office of Arts and Culture Public Art · Dallas, TX
Announced welcome mural accompanying the building renovation; completion estimated for fall 2027.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
civic
Representative commissioner image Image: dallascityhall.com ↗ Announced
City of Dallas — Office of Arts and Culture Public Art · Dallas, TX
Announced wayfinding landmark; City lists community engagement and expected winter 2027 completion.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor civic
Commissioning organization logo Image: arvadaco.gov ↗ Deadline passed; outcome unconfirmed
City of Arvada — Arts and Culture Commission · Arvada, CO
Water-inspired sculpture near Arvada Aquatics Center, planned for October 2027 installation.
Published funding USD 74,500
Funding scope Expected all-inclusive commission, including design, engineering, permits, fabrication, transport, installation and insurance.
Deadline as published Sunday, October 4, 2026 (11:59 PM) Deadline date has passed. This does not establish the selection outcome.
outdoor sculpture permanent civic
Commissioning organization logo Image: nmarts.org ↗ Selection underway
New Mexico Arts · NM
Functional public-art sundial. A September 29 notice schedules finalist selection for November 18, 2026.
Published funding USD 300,000
Funding scope Published project budget; inclusions unverified.
Deadline as published Deadline to apply: 9/4/2026 Deadline date has passed. This does not establish the selection outcome.
civic
Representative commissioner image Image: lovelandpublicart.org ↗ © 2021 Art In Public Places. All Rights Reserved. (as credited at source) Deadline passed; outcome unconfirmed
City of Loveland — Art in Public Places · Loveland, CO
Paint active electrical cabinets along downtown 4th Street with designs celebrating downtown life.
Published funding USD Amount not documented
Funding scope Artist payment at $25–30 per square foot; total depends on assigned cabinets.
Deadline as published 5:00 p.m. on Friday, October 2, 2026 Deadline date has passed. This does not establish the selection outcome.
outdoor civic
Commissioning organization logo Image: fcgov.com ↗ Open call at review
City of Fort Collins — Art in Public Places · Fort Collins, CO
Permanent artwork at 702 West Drake Road.
Published funding USD Up to 295,000
Funding scope All-in ceiling, including design, fabrication, transport, installation and travel.
Deadline as published November 16, 2026, 11:59 pm MST Future calendar date; confirm current terms with the commissioner.
outdoor permanent civic
Commissioning organization logo Image: artinpublicplaces.org ↗ © 2026 Art in Public Places. (as credited at source) ©2024 Art in Public Places . Bend, Oregon (as credited at source) Deadline passed; outcome unconfirmed
Art in Public Places — Bend · Bend, OR
Design-only commission for Corten-panel cladding on three campus structures.
Published funding USD Amount not documented
Funding scope Design fees vary by structure; amounts unpublished. Construction team handles fabrication and installation.
Deadline as published January 23, 2025 Deadline date has passed. This does not establish the selection outcome.
outdoor metal civic
Commissioning organization logo Image: 4culture.org ↗ © 4Culture (as credited at source) Deadline passed; outcome unconfirmed
4Culture · Kent, WA
Digital designs for the new shelter’s mural panels and privacy window film.
Published funding USD 15,000
Funding scope Design fee including tax; separate $3,000 digital-file allowance and up to $3,000 each for travel and engagement.
Deadline as published 4:00 PM PDT on Wednesday, July 29, 2026 Deadline date has passed. This does not establish the selection outcome.
indoor civic community
Representative commissioner image Image: publicinput.com ↗ Angelina Marino-Heidel and Joel Heidel (concept board) (as credited at source) Awarded
City of Raleigh — Raleigh Arts · Raleigh, NC
Marino Heidel’s corridor commission: seven sculptures installed in 2026; two more planned by 2027.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor sculpture community civic
Verified project-site image Image: engage.raleighnc.gov ↗ Photo: Mark Alan Howard. (as credited at source) Awarded
City of Raleigh — Raleigh Arts · Raleigh, NC
Five selected practices develop viewsheds and wayfinding; installation anticipated by July 2027.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor interactive civic
Commissioning organization logo Image: alexandriava.gov ↗ Announced
City of Alexandria — Office of the Arts · Alexandria, VA
Approved planning for art integrated into City Hall and Market Square renovations, with construction anticipated during 2026–2028.
Published funding USD 320,000
Funding scope Plan allocation: $150,000 each for indoor and outdoor work; $20,000 temporary construction art. Includes design, fabrication, installation and contingency; not one artist fee.
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
indoor outdoor permanent temporary civic
Source-page image · match unverified Image: alexandriava.gov ↗ Awarded
City of Alexandria — Office of the Arts · Alexandria, VA
DeWitt Godfrey is commissioned to integrate a permanent landmark with the Eisenhower East park and landscape design.
Published funding USD 50,000
Funding scope South Circle concept/community-engagement phase only. Plan identifies $300,000 developer funds overall; later fabrication/installation contract unverified. North Circle funding excluded.
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor permanent park civic
Commissioning organization logo Image: alexandriava.gov ↗ Awarded
City of Alexandria — Office of the Arts · Alexandria, VA
Five artists were contracted in November 2024 for art integrated into the planned 5.3-mile transit corridor.
Published funding USD 150,000
Funding scope 2023 Phase 1 plan allocation: $142,500 design/fabrication/installation and $7,500 contingency; current contracts and later phases unverified.
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor permanent transit civic
Commissioning organization logo Image: phila.gov ↗ Awarded
Creative Philadelphia — City of Philadelphia · Philadelphia, PA
Dyymond Whipper-Young and Michael Coppage won the Vare sculpture commission accompanying Rebuild improvements.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor permanent sculpture metal community civic
Commissioning organization logo Image: phila.gov ↗ Deadline passed; outcome unconfirmed
Creative Philadelphia — City of Philadelphia · Philadelphia, PA
Two complementary mosaics for the recreation center’s exterior addition and interior entry. Selection outcome remains unverified.
Published funding USD 160,000
Funding scope All project costs, including fees, fabrication, installation, engineering, wall preparation and community engagement.
Deadline as published July 17, 2025, at 5:00PM ET Deadline date has passed. This does not establish the selection outcome.
outdoor indoor permanent community civic
Commissioning organization logo Image: moraclt.org ↗ © 2026 Monroe Road Advocates (as credited at source) Deadline passed; outcome unconfirmed
Arts & Science Council — Charlotte and Mecklenburg County Public Art · Charlotte, NC
Integrated wetland-inspired art and wayfinding; construction/installation projected summer 2029.
Published funding USD 938,050
Funding scope All artist fees, design, engineering, fabrication, permitting, installation, travel, taxes and insurance.
Deadline as published February 6, 2026, at 11:59 p.m. EDT Deadline date has passed. This does not establish the selection outcome.
permanent community civic
Commissioning organization logo Image: littlerock.gov ↗ Copyright © 2026 - City of Little Rock. All Rights Reserved. (as credited at source) Completed
Sculpture at the River Market · Little Rock, AR
Craig Campbell’s bronze was unveiled May 13, 2026 beside Robinson Center through the nonprofit and LRCVB partnership.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor sculpture metal civic
Source-page image · match unverified Image: tempoartmaine.org ↗ Completed
TEMPOart · Portland, ME
Gillian Christy’s twelve-foot sculpture was installed June 2025 at Portland City Hall Plaza.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor temporary sculpture metal civic community
Representative commissioner image Image: fwpublicart.org ↗ © Copyright Fort Worth Public Art and Arts Council of Fort Worth & Tarrant County 2022 | All Rights Reserved (as credited at source) Awarded
Fort Worth Public Art — City of Fort Worth / Arts Fort Worth · Fort Worth, TX
Paul Kittelson’s City commission is scheduled for dedication October 16, 2026 at Eastchase Parkway and Meadowbrook Boulevard.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor permanent sculpture metal civic
Source-page image · match unverified Image: sandiego.gov ↗ Awarded
City of San Diego — Cultural Affairs Public Art · San Diego, CA
Nate Page’s Black Mountain Ranch proposal translates the fire station’s service-area terrain into a stone sculpture.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
sculpture stone civic
Source-page image · match unverified Image: sandiego.gov ↗ Awarded
City of San Diego — Cultural Affairs Public Art · San Diego, CA
Christian Moeller’s proposed 50-foot wind-responsive sculpture marks the treatment facility entrance on Eastgate Mall.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor sculpture kinetic civic
Source-page image · match unverified Image: sandiego.gov ↗ Awarded
City of San Diego — Cultural Affairs Public Art · San Diego, CA
Re:site’s proposed dimensional wall combines Cowles Mountain contours and local wildflowers; apparent colors change as viewers move.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
interactive community civic
Source-page image · match unverified Image: tampa.gov ↗ Copyright ©2026 - City of Tampa (as credited at source) Completed
City of Tampa — Arts & Cultural Affairs · Tampa, FL
Luftwerk interprets local tides using NOAA data and changing LED colors in a dimensional wall work.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
indoor sculpture light metal civic
Source-page image · match unverified Image: tampa.gov ↗ Copyright ©2026 - City of Tampa (as credited at source) Completed
City of Tampa — Arts & Cultural Affairs · Tampa, FL
Jason Bruges Studio’s suspended light sculpture translates lightning behavior into algorithmic animation.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
indoor sculpture light civic
Source-page image · match unverified Image: tampa.gov ↗ Copyright ©2026 - City of Tampa (as credited at source) Completed
City of Tampa — Arts & Cultural Affairs · Tampa, FL
Kipp Kobayashi’s stainless-steel installation combines smoke and sail imagery in the Franklin Street entrance rotunda.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
indoor sculpture metal civic
Commissioning organization logo Image: cabq.gov ↗ © 2026 The City of Albuquerque. All Rights Reserved. (as credited at source) Completed
City of Albuquerque — Public Art Program · Albuquerque, NM
Sheet Metal Workers Local Union 49 created this Rail Yards sculpture; dedication occurred August 30, 2026.
Published funding Not documented
Funding scope Not documented
Deadline as published No deadline documented No dated deadline established. Confirm the next step with the commissioner.
outdoor sculpture metal community civic
Representative commissioner image Image: nyc.gov ↗ © City of New York. 2025 All Rights Reserved. (as credited at source) Deadline passed; outcome unconfirmed
New York City Department of Cultural Affairs · New York, NY
DDC’s coordinated Percent for Art selection covers three named jail facilities; this record preserves the single shared application process.
Published funding USD Up to 900,000
Funding scope Maximum per facility, including artist fee, fabrication, installation and contingency; site preparation by design-builder.
Deadline as published April 20, 2026 at 5:00 PM EST Deadline date has passed. This does not establish the selection outcome.
indoor outdoor sculpture permanent civic