Installation time excludes some operating features
The artist’s published specification separates sculpture assembly from its lighting and breathing systems. It describes two to three days for installation without a wooden base, or three to four with one, plus a suggested weather contingency day; lighting and breathing are excluded from that estimate. Deinstallation is also a multiday operation. Crane size depends on vehicle access, and the anchoring approach changes the equipment list. These details are a starting point for a site-specific discussion, not a construction plan.
Marco Cochrane — I AM / R-Evolution installation specifications ↗ · Reviewed 2026-10-10
What dated crew schedule and engineered lifting, anchoring and electrical plans apply to the proposed location?