Documented artwork / sculptural garden
Central Garden
Credit as documented: Robert Irwin
The Getty commissioned Robert Irwin's Central Garden as part of the Getty Center in Los Angeles, opening it with the campus in 1997. Getty treats the 134,000-square-foot landscape as sculpture within its art collection. Visitors encounter it through bodily movement, changing viewpoints and natural materials. From the overlook, the garden visually extends toward the city, ocean and sky. Trees clipped into a hedge and an angled path establish a strong geometric structure.
Already working on a project?
Adds directly to your existing saved project and keeps its brief intact.Documented work. Current availability, ownership and installation requirements must be confirmed with the artist.

At a glance
- Year / version
- 1997
- Materials
- plants, water, constructed landscape elements
- Documented setting
- outdoor
- Dimensions
- 134,000 square feet
- Dimensions apply to
- Garden area as described by Getty; not object height or transport dimensions.
- Availability
- Unconfirmed
Places & versions
Installation history
Historical presentations. A past installation does not establish the current location or suitability for a new site.
1997
Getty Center, Los Angeles
- Site
- Getty Center
- Commissioner
- The Getty
- Start year
- 1997
- Date meaning
- documented
Installation details checked 2026-10-17.
Materials and construction
Irwin related the planted and constructed forms to Richard Meier's surrounding architecture. Water moves through a channel at the overlook toward the garden. The published area describes this extensive landscape work, not the dimensions of a transportable object.
From a reference to your project
Keep the idea.
Shape the brief.
Save this reference to your shortlist while you explore. Review your selection, then carry the references you choose into a commissioning brief for your site, audience, timing and open questions.
Your shortlist is saved on this device. Saving a reference does not contact the artist or reserve a work. Participation, availability, price and site suitability need confirmation.
Plan the next step
Sources
- www.getty.edu ↗ · Checked 2026-10-16
- www.getty.edu ↗ · Checked 2026-10-17