Documented artwork / light and sound installation

Beams

Playmodes

A corridor of choreographed lighting and spatial sound first presented at Life Is Beautiful in Las Vegas. Each lighting element drives a related sound oscillator, allowing the installation to function as a large audiovisual instrument.

Saves on this device.
Already working on a project?Adds directly to your existing saved project and keeps its brief intact.

Documented work. Current availability, ownership and installation requirements must be confirmed with the artist.

See the documented project and images

The source record

A closer look
starts here.

Explore photographs and project details on the linked source page.

See the documented project and images

At a glance

Year / version
September 2018
Materials
moving head lights, luminous columns, speakers
Documented setting
outdoor
Dimensions
100 m alley length
Dimensions apply to
Documented September 2018 Life Is Beautiful configuration; width, height and alternative sizes are not specified.
Availability
Unconfirmed

Places & versions

Installation history

Historical presentations. A past installation does not establish the current location or suitability for a new site.

  1. September 2018

    Life Is Beautiful festival, Las Vegas

    Event
    LIB festival
    Start date
    2018-09
    Date meaning
    premiere

    Installation details checked 2026-10-16.

    Installation source

From a reference to your project

Keep the idea.
Shape the brief.

Save this reference to your shortlist while you explore. Review your selection, then carry the references you choose into a commissioning brief for your site, audience, timing and open questions.

Your shortlist is saved on this device. Saving a reference does not contact the artist or reserve a work. Participation, availability, price and site suitability need confirmation.

Research notes for project planning

How this work was made and presented

Las Vegas premiere, September 2018.

A corridor becomes an instrument

Playmodes records Beams’ premiere at Life Is Beautiful in Las Vegas in September 2018. A hundred-metre alley between stages held moving lights, luminous columns and distributed speakers. Light brightness, speed and position drove sound oscillators, turning the corridor into a linked audiovisual instrument that could be sequenced or played live from its control booth.

Playmodes: Beams ↗ · Reviewed 2026-10-11

For your project brief

Would the host program sequenced playback, live performance or both along the visitor route?

Big Art Partners planning prompt

Published rider; current revision and site quantities require confirmation.

Calibration is part of the schedule

Playmodes’ Beams document separates hardware setup from software and audiovisual calibration. It asks for hardware installation two days before opening and at least one full day and night for the studio’s adjustments. The listed team includes studio software specialists, sound and light technicians, and setup and dismantling labor, making responsibilities and access time part of the production brief.

Playmodes: Beams document ↗ · Reviewed 2026-10-11

For your project brief

Who supplies each crew role, and when can the studio test after dark before opening?

Big Art Partners planning prompt

Plan the next step

Sources