← Commission briefs
Source-page image · match unverifiedImage: sandiego.gov ↗
Researched commission brief
Beyer Park tree sculpture
Ingram Ober and Marisol Rendon propose a Catalina Ironwood inside a sculptural enclosure, linking tree growth with environmental awareness.
City of San Diego — Cultural Affairs Public Art

Commission facts
Awarded
No dated deadline established. Confirm the next step with the commissioner.
- Source-observed stage
- Awarded
- Location
- San Diego, CA
- Deadline as published
- No deadline documented
- Source time
- Not documented
- Source timezone
- Not documented
- Published funding
- Not documented
- Funding scope
- Not documented
Calendar flags use the UTC date; the original deadline and timezone are preserved. A passed date does not establish whether selection is underway, awarded or closed.
Who may apply
Not documented; confirm with the commissioner.
Selection / procurement route
Artists selected; fabrication listed.
Deliverables
- Tree, wireframe enclosure and timed water mist.
Site requirements
- Proposed structure: 25 feet high, 12-foot base diameter, 30-foot canopy diameter; four-foot concrete planter.
Maintenance & care
Not documented. Confirm during project planning.
Unresolved questions
- Contract value, completion date, final engineering, irrigation and tree-care responsibilities.
Commissioner contact / project page ↗
Sources & review dates
- www.sandiego.gov ↗ · Reviewed 2026-10-11
Primary project evidence; unspecified terms remain unknown.
- www.sandiego.gov ↗ · Reviewed 2026-10-11
Fabrication listed.