The opportunity
Create original permanent art specifically for the Nixon Road corridor: one installation or a series across three roundabouts and nearby sidewalk/bus-stop areas. Three-dimensional work is expected; two-dimensional imagery on sculptural substrates is welcome. Safety/sightlines, possible breakaway mounting, durable materials and Michigan-engineer-stamped drawings are required considerations. Roundabout centers have no power; sidewalk locations generally do. Approximate schedule: semifinalists December 2026, finalist March 2027, completion 2028 or earlier. The selected artist contracts with the City of Ann Arbor; the commission budget covers all selected locations.
Who can apply
Any artist or team residing in the United States, 18+, able to work in Ann Arbor as needed; visa holders must be able to work legally in the U.S.
Funding & costs
‘The total commission budget is $75,000’, inclusive of design, assistants, engineering and stamped drawings, permits, insurance, materials, fabrication, transport, installation, site work, travel, per diem, documentation and contingency; it may fund one location or be divided along the corridor. Up to five semifinalists each receive a $750 stipend outside the $75,000.
Application fee: 0
Source status last checked 2026-10-27. General terms reviewed 2026-10-18. Confirm current terms, eligibility and deadline timezone with the organizer.